Water connection fees are determined based on the size of your service line and meter. City crews make all physical connections to the water main line; and therefore, the connection fee includes a tap fee and a PIF. Most single family homes use a 3/4 inch service line/water meter.
Size | Tap | PIF | Total Connection Fee |
---|---|---|---|
3/4 inches | $700 | $3,087 | $3,787 |
1 inches | $875 | $4,108 | $4,983 |
1.5 inches | $2,050 | $7,320 | $9,370 |
2 inches | $2,900 | $10,830 | $13,730 |
3 inches | $6,875 | $18,648 | $25,523 |
4 inches | $12,850 | $29,603 | $42,453 |
6 inches | $19,850 | $93,355 | $113,205 |
Resolution Number 68-19 Adopting Plant Investment Fees for Water Utility (PDF)
Fireline Connections will be billed on a time and material basis. For more information please contact Pipeline Maintenance at 970-244-1572.
The Ridges Irrigation connection fee is a flat $260 for any new connection to the system. Your contractor makes the connection, so the irrigation connection fee is made up of a PIF only.