September 2008
What is the 29 Road Corridor? -
29 Road corridor is a principal arterial that will eventually extend
from I-70 on the north to Hwy 50 on the south.
- The 29 Road and
I-70B is the seventh phase of the development of this transportation
corridor.
- The potential intersection of 29 Road and I-70B
is being studied as part of the Colorado Department
of Transportation (CDOT) Interchange Approval Process.
What is the Interchange Approval Process?
- CDOT
Policy Directive 1601 establishes consistent guidelines for the
review and evaluation of requests for new interchanges and major
improvements to existing interchanges on major state
highways. Many of the alternatives being considered for the connection
of 29 Road and I-70B
include an interchange. The directive includes requirements for
preparation of a feasibility study and
an environmental study.
What is a Feasibility
Study? - A Feasibility
Study examines the traffic impacts of the proposed interchange
or interchange improvement on the surrounding arterial roadway
system and identifies all necessary improvements
to accommodate the anticipated traffic.
The Feasibility
Study must also consider alternate routes, accident history,
potential economic development impacts, and present a broad
evaluation of potential environmental impacts.
What is an Environmental
Assessment (EA)? - An Environmental Assessment
(EA) describes the purpose and need for the project and evaluates
potential social, economic, and environmental impacts of the
proposed improvements.The EA includes a description of a range
of reasonable alternatives and a detailed description of potential
impacts and measures to avoid or minimize negative impacts. It
is not known at this time whether an EA will be required for
this project. However if it is required, the City will prepare
both the Feasibility Study and the EA for review and approval
by CDOT. Interested agencies and the public must be involved
in the development of the EA.
What is the
Schedule for Completion of the Interchange Approval Process? - It is anticipated that the process
for the I-70B and 29 Road connection will be complete in
2008 at which point a design consultant and right or way acquisition consultant will be hired to complete the design and help the City acquire the necessary right of way.
When will Construction
Start? - It is anticipated
that construction will begin in 2009 and continue through 2010.
What Opportunities for Public Involvement
were Provided During the Project? How Can I Learn More About
the Project?
- Public open houses
- Small group meeting/briefings
- Individual contacts
- Newsletters
- Newspaper articles/advertisements
- Television/radio announcements
- Comment sheets
- Interviews/surveys
|