Bid Summaries
Tabular summaries of contractors' bids and engineers' estimates for a specific project.
2008 Purdy Mesa Flow Line Replacement - Bid Summary 2008 29 Road and I-70B Irrigation Package - Bid Summary 2008 Monument Road Bridge Replacement Project 2008 Colorado Avenue Landscaping Project 2008 Curb, Gutter and Sidewalks, Phase B 2008 23 1/2 Road Extension Bid Summaries 2008 Ranchmen's Ditch, Phase II, Part B - Final Bid Summary 2008 Waterline Replacement 2008 Curb, Gutter & Sidewalk Replacement South Street Asbestos Contaminated Soil Removal 2008 Asphalt Overlays 2008 Concrete Repair for Overlays G.5 Road Improvements - Schedule A 26 Road Improvements - Schedule B
2007 Curb, Gutter, and Sidewalk Replacement 2007 Sewer Line Replacement 7th Street Corridor Project, Schedule A 7th Street Corridor Project, Schedule B 7th Street Corridor Project, Schedule C 7th Street Corridor Project, Phase II - Landscape and Irrigation Alley Improvements 23 Road Sewer Improvement District Asphalt Overlays Concrete Repair for 2007 Street Overlays Galley Lane Sewer Improvement District Grand Mesa Reservoir No. 1 Dam Renovation I-70 & 24 Road Interchange Landscape Improvements New Sidewalks Patterson Road Stucco Wall Repair
Persigo WWTP Raw Sewage Wet Well Rehabilitation Project Ranchmen’s Ditch Flood Control Project, Phase 1 - RCP Option Ranchmen’s Ditch Flood Control Project, Phase 1 - SmoothCor Option Ranchmen’s Ditch Flood Control Project, Phase II River Road Interceptor Rehabilitation Schedule A:FD River Road Interceptor Rehabilitation Schedule B:PD Water Line Replacement
This page updated August 10, 2010
Development Services