2006 Submittal Standards for Improvements and Development (SSID)

 

SSID CHECKLISTS: All Checklists included in this manual are samples only and should not be used to prepare a submittal application for review by the City of Grand Junction. An offical Checklist will be prepared by a member of the Community Development Department that reflects the specific requirements for each development proposal. Applications that have been prepared with a Sample Checklist will NOT be accepted for review.
 
TABLE OF CONTENTS
PREFACE
I. PURPOSE & SCOPE I-1
  A. PURPOSE I-1
  B. AUTHORITY AND SCOPE I-1
    1. Jurisdiction I-1
    2. Conflicting Provision I-1
II. APPLICATION PHASE SUBMITTALS II-1
  A. SUBMITTAL REQUIREMENTS II-1
  B. MINIMUM SUBMITTAL REQUIREMETNS II-1
  C. CHECKLISTS II-1
    ANNEXATION II-2
    BOUNDARY AGREEMENT - DISPUTED II-3
    CHANGE OF USE II-4
    CONCEPT PLAN II-5
    CONDITIONAL USE PERMIT II-6
    CONDITIONAL USE PERMIT – GRAVEL PIT II-7
    CONDITIONAL USE PERMIT - SITE PLAN REVIEW II-8
    CONDITIONAL USE PERMIT - TELECOMMUNICATIONS TOWER II-9
    CONDOMINIUM II-10
    FLOODPLAIN PERMIT II-11
    GRADING PERMIT II-12
    GROWTH PLAN AMENDMENT II-13
    HISTORIC DESIGNATION II-14
    INSTITUTIONAL & CIVIC FACILITY MASTER PLAN II-15
    OUTLINE DEVELOPMENT PLAN – ODP II-16
    PLANNED DEVELOPMENT – FINAL II-17
    PLANNED DEVELOPMENT – PRELIMINARY II-18
    REVOCABLE PERMIT II-19
    REZONE II-20
    REZONE – PRELIMINARY PLAN II-21
    SITE PLAN REVIEW – MAJOR II-22
    SITE PLAN REVIEW – MINOR II-23
    SITE PLAN – SIMPLE SUBDIVSION II-24
    SUBDIVISION, MAJOR – PRELIMINARY II-25
    SUBDIVISION, MAJOR – FINAL II-26
    SUBDIVISION - SIMPLE II-27
    TEMPORARY USE PERMIT II-28
    VACATION OF EASEMENT/ROW/PLAT II-29
    VARIANCE II-30
    VARIANCE – SIGN II-31
III. SUBMITTAL FORMAT III-1
  A. GENERAL REQUIREMENTS III-1
    1. Fees III-1
    2. Collated Packages III-1
    3. Order of Submitted Items III-1
    4. Securing Packages III-1
    5. Submittal Checklist III-1
    6. Review Agency Comment Sheets III-1
    7. Original Signatures III-1
  B. DRAWINGS III-1
    1. Folded III-1
    2. Rolled III-1
    3. Application and Design Drawings III-2
      a. Informational Drawings III-2
      b. Construction Drawings III-2
    4. As-Built Sketches III-2
    5. As-Built Drawings III-2
IV. GENERAL SUBMITTAL REQUIREMENTS IV-1
  A. ADMINISTRATIVE REQUIREMENTS IV-1
    1. Annexation Documentation IV-1
    2. Appraisal of Vacant Land IV-1
    3. Avigation Easement IV-1
    4. Boundary Agreement IV-1
    5. County Treasurer’s Tax Certification IV-1
    6. Covenants, Conditions, and Restrictions IV-2
    7. Conveyances IV-2
    8. Condominium Plat IV-2
    9 Deed IV-2
    10. Development Improvements Agreement (DIA) and Guarantee IV-2
      a. Exhibit B “Cost Estimate” IV-2
      b. Agreement IV-2
      c. Guarantee IV-2
      d. Release of Guarantee and Agreement IV-2
    11. Development Schedule IV-3
    12. Easement IV-3
    13. Haul Route Plan IV-3
    14. Ownership Information IV-3
      a. Ownership Statement IV-3
      b. Proof of Owner(s) IV-3
      c. Lease Agreements IV-3
    15. Legal Description IV-4
    16. Location Map IV-4
    17. Name and Address List IV-4
    18. Planning Clearance IV-4
    19. Power of Attorney for Improvement District IV-4
    20. Review Agency Comment Sheet IV-4
    21. Right-of-Way IV-4
    22. Sign Plan/Sign Package IV-4
    23. Site Data Table IV-4
    24. Submittal Checklist IV-5
    25. Surveyor Verification IV-5
  B. SPECIAL ENGINEERING AND PERMIT REQUIREMENTS IV-5
    1. 404 Permit IV-5
    2. CDOT Access Permit IV-5
    3. Floodplain Permit IV-5
    4. Industrial Pretreatment IV-5
    5. National Pollution Discharge Elimination System (NPDES) – Colorado Department Of Public Health and Environment (CDPHE) Construction Activity Permit IV-5
V. DRAWING AND GRAPHIC STANDARDS V-1
  COMPOSITE PLAN V-2
  DETAIL SHEET V-3
  ELEVATION AND PERSPECTIVE DRAWING V-4
  GRADING PLAN V-5
  INSIDE COVER SHEET V-6
  INSTITUTIONAL AND CIVIL FACILITY MASTER PLANS V-7
  IRRIGATION PLAN & PROFILE V-8
  IRRIGATION SYSTEM DESIGN MAP V-9
  LANDSCAPE PLAN V-10
  LIGHTING PLAN V-11
  LOCATION MAP V-12
  MAP FOR DISPUTED BOUNDARY AGREEMENT V13
  ODP DRAWING V-14
  PLAT V-15
  PRELIMINARY COMPOSITE PLAN V-16
  PRELIMINARY LANDSCAPE PLAN V-17
  PRELIMINARY PLAN FOR SUBDIVSION V-18
  ROAD CROSS-SECTIONS V-19
  ROADWAY PLAN & PROFILE V-20
  SITE ANALYSIS V-21
  SITE PLAN V-22
  SITE PLAN – PRELIMINARY V-23
  SITE SKETCH V-24
  SKETCH FOR DESCRIPTIONS V-25
  STORMWATER MANAGEMENT PLAN V-26
  TRAFFIC PLAN V-27
  WATER & SEWER SYSTEM DESIGN MAP V-28
  WATER, SEWER, & STORM SEWER PLAN & PROFILE V-29
  WATER & SEWER SYSTEM DESIGN MAP V-30
  GRAPHIC STANDARDS V-31
    A. SCALE V-31
    B. SIZE V-31
    C. PRIMARY AND SECONDARY PROPOSED FEATURES V-31
    D. NOTATION V-31
    E. LINE WEIGHT AND TYPE V-31
    F. LOCATION V-31
    G. HORIZONTAL CONTROL V-31
    H. VERTICAL CONTROL V-32
    I. ORIENTATION V-32
    J. SEALED DRAWINGS V-32
    K. TITLE BLOCK V-32
    L. STANDARD DRAWINGS AND SPECIFICATIONS V-32
    M. SYMBOLS V-32
    N. ABBREVIATIONS V-32
    O. AS-BUILT DRAWINGS V-32
    P. MULTIPLE SHEETS V-32
    Q. CONTOURS V-32
      1. Interval V-32
      2. Extent V-32
    R. NEATNESS AND LEGIBILITY V-32
    S. SITE SKETCHES V-32
    T. MODEL LANGUAGE V-32
    U. IMPROVEMENT SURVEY PLAT V-33
    V. INK FOR MYLAR PRINTS V-34
VI. REPORT STANDARDS VI-1
  FINAL DRAINAGE REPORT VI-2
  FINAL GEOTECHNICAL REPORT VI-3
  GENERAL PROJECT REPORT VI-4
  HISTORIC DESIGNATION PROJECT REPORT VI-5
  PHASE I / II EVNIRONMENTAL REPORT VI-6
  PRELIMINARY DRAINAGE REPORT VI-7
  PRELIMINARY GEOTECHNICAL REPORT VI-8
  SEWER SYSTEM DESIGN REPORT VI-9
  STORMWATER MANAGEMENT PLAN VI-10
  TRAFFIC IMPACT STUDY VI-11
  TRANSACTION SCREEN PROCESS VI-12
  WATER SYSTEM DESIGN REPORT VI-13
VII. CONSTRUCTION PHASE SUBMITTALS VII-1
  A. CONSTRUCTION PHASE SUBMIITALS VII-1
  B. APPROVAL OF CONTRUCTION DRAWINGS VII-1
  C. GENERAL CONSTURCTION SUBMITTAL REQUIREMENTS VII-1
    a. General Construction Submittal Requirements VII-1
      i. REQUIRED QUALITY CONTROL AND ASSURANCE VII-1
      ii. RESPONSIBILITY VII-1
      iii. CONSTRUCTION OBSERVATION REPORTING VII-1
      iv. CITY INSPECTION VII-1
      v. CONSTRUCTION SEGMENTATION VII-1
    b. Construction Phase Submittal Items VII-1
      i. Draft Sanitary Sewer As-Builts VII-1
      ii. Draft Storm Sewer As-Builts VII-1
      iii. Materials Testing Reports VII-1
        1. Compaction test results VII-1
        2. Materials Tests Reports VII-1
        3. Testing Location Maps VII-1
        4. Materials Proctors VII-1
        5. Failing Tests VII-1
      iv. Certificates of Compliance VII-1
      v. Stormwater Control Facility Certification VII-1
      vi. Sewerline Lamping and Pressure Testing VII-1
      vii. Water Line Pressure and Disinfection Tests VII-1
      viii. Work Within Public Right-of-way Permit VII-1
  D. MAINTENANCE GUARANTEE VII-1
    a. Release of Guarantee and Agreement VII-1
    CONSTRUCTION PHASE SUBMITTAL CHECKLIST VII-2
    AS-BUILT GRADING VII-3
    AS-BUILT ROADWAY VII-4
    AS-BUILT UTILITIES VII-5
    CONSTRUCTION REPORT: CONCRETE AND PAVEMENT PLACEMENT VII-6
    CONSTRUCTION REPORT: CONCRETE AND PAVEMENT PREPARATION VII-7
    CONSTRUCTION REPORT: GRADING & PIPELINE PHASE VII-8
This page updated May 21, 2007

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
  City CouncilFire DepartmentJob OpportunitiesNews ReleasesParks and RecreationPoliceVisitor and Convention Bureau  
  City of Grand Junction, Colorado  Copyright 2001DisclaimerEmail the Webmaster