Utility Billing   (Continued)

Customer Service is located in the main lobby on the first floor of the City Hall (NE corner of 5th & Rood). We are open Monday through Friday from 7:30am to 5:30pm. Contact us at 970-244-1579.

New Construction/Connection to the System

If you are building a new residential or commercial building and connecting to the City's water, sewer and/or Ridges irrigation system, a connection fee is due. A connection fee is comprised of a Tap Fee and/or a Plant Investment Fee (PIF). A Tap Fee covers the actual time and material costs to make a connection, and a Plant Investment Fee is a one-time, new connection fee that is intended to recover the cost of constructing the system. In other words, the system has been built to serve future users. As those future users connect to the system, they have to pay back their fair share of the system construction costs. Plant Investment Fees are calculated based on the expected impact of a new connection to the system. Sometimes additional plant investment fees are due when the use of an existing connection changes.

SEWER CONNECTION FEE: Sewer connection fees are determined based on the expected impact of that connection to the system. Because you hire your own contractor to make the physical connection to the sewer main line, the connection fee is made up of a PIF only. The sewer connection fee for a single family home is currently $2,000 (effective 1/1/2007). Additional tap fees are due when the home is located in a separate sanitation district.

Note: Every five years, the City (as the manager of the system) completes a comprehensive rate study to verify that rates are adequate to allow for the maintenance and expansion of the sewer system. The latest study that was conducted last year indicated that the current value of the PIF in this system is $3,220. The County Commissioners and the City Council (the system is jointly owned by both the City and the County) decided to implement the increase only to $2,000 at this time. They will continue to discuss the recommendations of the rate study and may possibly authorize another increase and/or a schedule of increases.

The monthly sewer fee for a single family home is currently $14.25. Again, if the home is located within a separate sanitation district then there is an additional monthly sewer fee paid to the district.

Multiple family or commercial connection fees are calculated by formulas. These formulas use a factor called EQU (equivalent residential unit) which is then multiplied by the minimum connection fee of $2,000 to get the total sewer connection fee. The EQU factor is also used to calculate the monthly sewer service charge ($14.25 per EQU). Some examples of those calculations are listed below.

  Please Note - The calculations below are intended for example purposes only. For a specific quote, contactDebi Overholt, Customer Service Supervisor at 970-244-1520.

Sewer Connection Fees (Example Calcuations)
DESCRIPTION
FORMULA
 

EXAMPLE

Multi-Family .72 X # of units = EQU   25 Unit Apartment Building: .72 X 25 = 18 EQUs X $2,000 = $36,000 sewer connection fee or PIF

Hotel-No Restaurant,
No Kitchen

.36 X # of rooms = EQU   200 room hotel: .36 X 200 = 72 EQUs X $2,000 = $144,000 sewer connection fee or PIF
Retail Store .35 X (square feet/1,000) = EQU   Store with 2,000 square feet: .35 X (2,000/1,000) = .7 EQU Minimum 1 EQU or $2,000 sewer connection fee or PIF
Laundromat .90 X # of washing machines = EQU   15 machine laundromat: .90 X 13.5 EQUs X $2,000 = $27,000 sewer connection fee or PIF
For multi-family or commercial sewer connections, the City does have an alternative calculation based on water consumption. For additional information, please contact Debi Overholt at 970-244-1520.

WATER CONNECTION FEE: Water connection fees are determined based on the size of your service line and meter. City crews make all physical connections to the water main line; and therefore, the connection fee includes a tap fee and a PIF. Most single family homes use a 3/4" service line/water meter and the fee currently is $1,000.

Water Connection Fees
SIZE
TAP
PIF
TOTAL CONNECTION FEE
3/4"
$700
$300
$1,000
1"
$875
$375
$1,250
1.5"
$2,050
$900
$2,950
2"
$2,900
$1,250
$4,150
3"
$2,975
$6,875
$9,850
4"
$12,850
$5,550
$18,400

6"

$19,850
$8,550
$28,400

FIRELINE CONNECTIONS will be billed on a time and material basis. For more information please contact Pipeline Maintenance at 970-244-1572.

RIDGES IRRIGATION CONNECTION FEE: The Ridges Irrigation connection fee is a flat $260 for any new connection to the system. Your contractor makes the connection, so the irrigation connection fee is made up of a PIF only.

    If you still have questions please call 970-244-1579   

    This page updated November 19, 2008

Topics of Interest

Paying Your Bill

Understanding Your Bill

Landlord/Property Owner Information

Delinquency (Past Due) Rules

Water Leaks

Sanitation Districts (Orchard Mesa, Central Grand Valley, Fruitvale Sanitation)

Other City Links
Utility Services - General Information

Water Service

Water Rates

Sewer Service
(Wastewater)

Sewer Rates

Trash Service
(Solid Waste)

Trash Rates

Irrigation Services
(Ridges Only)

Irrigation Rates

Industrial Pretreatment (Restaurants, Commercial Manufacturing)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 